As we head into the summer, our facilities team has planned a series of maintenance and repair works to be carried out during the school breaks to keenly assure that everything is in order before the start of each term. We are very excited to announce the upcoming maintenance and upgrades to be conducted in July 2023.
Electrical Infrastructure
Upgrades and inspections will be performed on electrical infrastructure to ensure that optimal safety and efficiency are maintained.
Replacement of outdated equipment will be carried out.
Testing and maintenance of electrical systems will be conducted.
Plumbing Systems
Repairs and maintenance will be performed on plumbing systems to prevent any potential leaks or water-related issues.
Inspection of pipes, faucets, and fixtures will be conducted.
Testing and adjustment of water pressure will be carried out.
Heating, Ventilation, and Air Conditioning (HVAC) Systems
Maintenance and cleaning of heating, ventilation, and air conditioning systems will be conducted to enhance indoor air quality and temperature control.
Inspection and servicing of HVAC units will be performed.
Optimization of temperature control will be ensured.
Safety Inspection
The safety inspection required by the local authority will be conducted on special equipment as per Vietnamese laws on Health & Safety & compliance.
Routine Maintenance Activities
Maintenance and repair of key items will be carried out.
Maintenance of wastewater treatment plants and swimming pools will be conducted.
Brightness levels in all areas will be reviewed.
Pest control treatment will be administered.
Deep Cleaning and Maintenance
Deep cleaning and shampooing of carpets and soft furniture will be conducted.
Deep clean of all toilets, lockers, and changing rooms will be carried out.
Maintenance of air filters and drinking water fountains will be conducted.
Specific Upgrades and Tasks
The air conditioning system at Primary Campus will be upgraded by replacing the units and fan coil units.
External glass cleaning will be performed at both campuses.
Drainage cleaning for sport fields and covered courts will be conducted.
Sand for the children's playground at Primary Campus will be renewed.
Recorders for the CCTV system at Primary Campus will be upgraded.
We assure you that we are committed to completing these maintenance and repair tasks as efficiently as possible. Our goal is to ensure that everything is in excellent condition before the start of the new term. We appreciate your support and patience during this time as we work to maintain a safe and conducive learning environment for your child. In addition to the maintenance and repair works mentioned above, we would like to inform you that we have more exciting projects underway. We are currently finalizing plans for upcoming improvements and upgrades that will further enhance our school facilities. We are eager to share these projects with you in the near future, as we continue to strive for excellence in providing the best learning environment for your child. Thank you for your continued support, and we look forward to keeping you updated on the exciting developments ahead.
Comentarios